Beaver Plastics Ltd.

High Level Crossing

Condo Complex in Edmonton, Alberta
Completed 2005-2007 using LOGIX ICF
High Level Crossing

Project Description/Details

All of the above ground exterior walls were build with 6″ & 8″ LOGIX ICF. LOGIX was the choose of the builder to make the complex a high energy efficient building