The Bow Building Highrise Office Tower in Calgary, Alberta Completed 2012 using Geofoam EPS 29 from Beaver Plastics Request A Quote Project Description/Details This project used Geofoam EPS 29 to line the structures foundation walls. The foundation covered two full city blocks. Previous Next