Bragg Creek area road stabilization
Road work on Road section near Bragg Creek, Alberta
Completed 2018
using Geofoam EPS 29 by Beaver Plastics Ltd.
Project Description/Details
This road section was prone to surface failures due to un-stable
sub-surface conditions. Geofoam was installed to provide a long
term solution and to mitigate costly repairs.