Calgary New Central Library
New Public Library in East Village Downtown Calgary
Completed 2018 over 4.5 years using Geofoam EPS29
![Calgary Central Library](https://beaverplastics.com/wp-content/uploads/2020/10/CCentralLib3-2.jpg)
Project Solution Overview
Provided a solid base for this unique building. Beaver Plastics provided both complete 3-D Geofoam Layout design and on site instruction for installation of the EPS Geofoam blocks.
![Calgary Library3D_1](https://beaverplastics.com/wp-content/uploads/2020/12/Calgary-Library3D_1.jpg)
![CCentralLib 1](https://beaverplastics.com/wp-content/uploads/2020/12/CCentralLib-1.jpg)
![CCentralLib2](https://beaverplastics.com/wp-content/uploads/2020/12/CCentralLib2.jpg)
![CCentralLib3](https://beaverplastics.com/wp-content/uploads/2020/12/CCentralLib3.jpg)