High Level Crossing
Condo Complex in Edmonton, Alberta
Completed 2005-2007
using LOGIX ICF
![High Level Crossing](https://beaverplastics.com/wp-content/uploads/2020/10/High-Level-Crossing-2-1.jpg)
Project Description/Details
All of the above ground exterior walls were build with 6″ & 8″ LOGIX ICF. LOGIX was the choose of the builder to make the complex a high energy efficient building
![High Level Crossing - 1](https://beaverplastics.com/wp-content/uploads/2021/01/High-Level-Crossing-1.jpg)
![High Level Crossing](https://beaverplastics.com/wp-content/uploads/2021/01/High-Level-Crossing-2.jpg)
![High Level Crossing - 3](https://beaverplastics.com/wp-content/uploads/2021/01/High-Level-Crossing-3.jpg)
![High Level Crossing - 4](https://beaverplastics.com/wp-content/uploads/2021/01/High-Level-Crossing-4.jpg)